Open Channel Design:

 - Design and supervise the installation of aquatic weed's barriers at New and Old Esna barrage as well as Al Nasr channel on the guide canal upstream lifting station no (1).
- Introducing alternatives for open channels rehabilitation to overcome water shortage and improve irrigation efficiency at tail ends in collaboration with local farmers.
- Evaluation and improving the hydraulic efficiency of main drains and its branches in east, middle and west delta regions.
- Hydraulic study of Bahr Yousef Canal to increase water' conveying and distribution efficiency".
- Proper management of open channel maintenance upstream coverages.
- Rehabilitation and improvement of irrigation infrastructures in fayoum and minya governorates.
- Study the impact of water discharges shortage on the performance of main canals and their branches.





-->